Showing posts with label Modelling the Railways of NSW. Show all posts
Showing posts with label Modelling the Railways of NSW. Show all posts

Saturday, May 18, 2019

MODELLING THE RAILWAYS OF NSW 36 - 18 MAY 2019

I was a presenter again!

Overall I think it went well... but I was working under duress!

I could not use my OWN computer and mouse, [on which I had thoroughly rehearsed and was fairly slick]; because my laptop was too modern and incompatible with the projector. [It could not connect to USB! It would only party with a 15-pin VGA connector.]

So, I had to borrow an unfamiliar computer at the last minute; and at times, this made me look like a goose.

What did this do for me...?

  • I could NOT see my presenter notes, so I had to guess what I meant to say with each slide, which was not easy, and it made me hesitant
  •  it compressed some of my slides so the text appeared in crazy ways
  •  the mouse was very sensitive - often it would run on two or three slides ahead
  • with a different mouse in my RIGHT hand I started pointing at the computer screen in front of me with my LEFT hand; instead of using the mouse-arrow that appeared on the projector screen for everyone to see - and of course I had only used the mouse pointer in rehearsal! LOL
  •  the videos did not run, or ran with sound but a black screen
  •  in later shows I was able to set up my own computer, and play videos there...and...
  •  Jonathan Hilliard, my co-presenter; downloaded software onto the computer that allowed some videos to play, but not all
  •  I fumbled with my demonstrations - in hindsight, I should have just left them running the whole time
In spite of these difficulties, people did seem to respond well to the presentation, and I made some new friends.

I promised to put up some posts based on the presentation so I will do that shortly...

ARDUINO - PART THREE: FIRST STEPS

[THIS SERIES COMING SOON]